Joe Belczak (Shop Crew and Staff , Black Hills Central Railroad)
Engine #104
-All new water glasses are installed and work great.
-Boiler hydro. was successful, and we will see 104 running in the first week of the season.
-Currently #104 is awaiting its test run and building up steam pressure.
Engine #110
-After many weeks of intense shop, we will see 110 under steam during opening week!
-The past weeks were spent putting all piping and appliances back on the boiler sides.
-After 110's test run, the locomotive will be operating daily with our seven car train.
Engine #7
-Currently, #7 awaits boiler repair and inspection. At this time of the season #7 will be shopped, and will await its hydro. when all repairs are made. Now that all major repairs on #110 are complete the shop crew will be able to spend more time with #7, and determine if it will operate for the 2009 season.
Car #65 (The New Car)
-The car shop has seen more and more progress with the car every day. Wall supports are in place and sub floor is complete.
-Since last post, #65 trucks have been completely disassembled and inspected.
-Due to years of use and abuse, all brake rigging was rebushed, and awaits assembly.
-New springs were delivered and await assembly to bolster.
-As soon as trucks are complete the shop crew will direct there attention to all plumbing and undercarriage work.