Our staff in the roundhouse has been working away to make sure the equipment is up and running for the summer season. Read on to find out about all of their hard work.
All of our coaches are being repainted by a contractor. They will all be the same burgundy red color. The photo above shows the Keystone car in the process of having its stain sanded off so it will be ready for paint.
Thomas sands the Keystone car.
Engine #104 had new ends installed on its super heaters and has successfully passed its Hydro test. It's ready for the summer season.
Engine #110 also had extensive work done on its super heaters. It has passed a flexible staybolt inspection and its Hydro test, but the roundhouse staff says there are still a lot of loose ends to tie up before it is ready for the summer season.
Mike on top of engine #110.
Engine #63's air system was overhauled and its components are ready to be installed.
It's sure to be a busy month and a half as they finish up all the loose ends and get ready to hit the rail!
Scott and Cesar give the welder some much needed attention.
David cuts out an old bushing from 110's suspension.
Scott uses engine #1 to switch engine #104 out of the shop.